spacer
 
 
Location

Kullu District, Himachal Pradesh, India

 
Construction commenced

November 2004

 
Expected Commercial operation

June 2008

 
Capital cost

200 M US$

 
Installed capacity

192 MW

 
Type Run-of-river
 
Average annual output 800 GWh
 
Gross head

858 m

 
Design flow

31 m3/sec

 
Vertical drop shaft 7m and 4.6m
 
Head regulator 6.8m width with two bays
 
Head race tunnel 2.4m wide and 3.4m high
 
Equipments

Two 96 MW vertical 5-jet Pelton units
Underground powerhouse
1750 m steel-linedpressure shaft

 
Power purchase agreement

Merchant power to northern region clients

 
Ownership Malana Power Company: 100%
SN Power: 49% (indirect)
 
Partner S N Power , Norway
 
Financing IFC and local Indian banks
 
Greenhouse gas saving

Est. 400 000 tonnes pa

 
footer seprator
spacer
spacer